Natural Resources
Current Opportunities
Lower Camas Meadows Restoration Project
The Chelan County Natural Resource Department solicits an Invitation to Bid for the Lower Camas Meadows Restoration Project, Chelan County, WA. This contract provides for the removal of a 92” pipe arch culvert and installation of a 15’9” Span by 8’ rise aluminum box culvert on Camas Creek. Channel grade control structures and a series of Engineered Log Jams (ELJ’s) will also be installed throughout the project area. This work includes, but is not limited to installation, maintenance and restoration of temporary construction access routes and staging areas; road closures and temporary traffic control as needed to safely deliver, handle, and stage equipment and materials as well as safely direct traffic around the project area; structure, channel, and roadway excavation; roadway grading and paving; temporary erosion and sediment control; design, procurement, and installation of the new road crossing structure; procurement, handling and installation of large wood within Camas Creek; protection of sensitive areas; construction surveying required to perform the aforementioned tasks; and all other work, all in accordance with the Contract Drawings, Technical Specifications, Contract Provisions, permit conditions and the Standard Specifications for Road, Bridge and Municipal Construction and addenda thereto.
All onsite work shall occur between the dates of September 3rd and October 31st, 2024 and the project shall be substantially complete no later than October 31st, 2024. The estimated range of probable cost is $549,600 - $607,400 excluding WSST.
A Mandatory Pre-Bid site walk through with representatives from the CONTRACTING AGENCY will be held on June 6th, 2024 at 11:00 AM. Attendees should meet at the project site. From US- 97, turn onto Camas Creek Road and travel roughly 3 miles to the junction of Camas Creek Road and NF-7200. A minimum of one representative from each Prime Contractor that intends to submit a bid is required to attend.
Sealed bids will be received by Chelan County at the Board of County Commissioners Chambers, Chelan County Administration Building, 400 Douglas Street, Wenatchee, Washington until Monday, June 17th, 2024 at 11:00 AM PDT for the Chelan County Natural Resources Project, “Lower Camas Meadows Restoration Project.” Hard Copies of the Project Manual and Bid Package are available upon request. Questions regarding the project should be submitted to BOTH Hannah Pygott and Bryan Maloney via email at Hannah.pygott@co.chelan.wa.us and Bryan.maloney@co.chelan.wa.us up until three business days before the scheduled bid opening.
If you would like to be added to the Planholders List for this Project, please click HERE.
Project Manual and Downloads:
- Project Manual
- Project Designs
- Bidder Questions and Clarifications
- Planholders list
- Addenda as applicable
Recently Advertised Projects |
Eagle Creek Culvert Replacement Project
The bid period for this project has closed. Bid were received and read aloud on Monday April 15th, 2024 at 11:00AM. The Contracting Agency has reviewed all proposals received and the Contract has been awarded to the low bidder for the base bid work only. Any questions regarding this project can be directed to Hannah Pygott at hannah.pygott@co.chelan.wa.us
Project Manual and Downloads:
- Project Manual Updated 3/8/24 to reflect the changes of Addendum No. 1
- Appendix D: Final Contract Drawings Updated 4/10/24 to Reflect Addendum No. 2
- Bidder Questions and Clarifications
- Planholders List
- Addendum No. 1 Issued 3/8/24
- Addendum No. 2 Issued 4/10/24
- Bid Tabulation 4/15/24
Upper Wenatchee FRB Spring 2024 Machine Thinning Project
The bid period for this project has closed. Bids were recieved by COB April 8th, 2024 and are now in review for accuracy and completeness. Any questions regarding this project can be directed to Erin McKay at erin.mckay@co.chelan.wa.us
Project Manual, Maps, and Resources
- Project Manual (Bid Forms Included)
- Upper Wenatchee FRB Spring 2024 Unit Map
- Upper Wenatchee FRB Spring 2024 Project Area Map
- Bidder Questions and Clarifications
- Bid Tabulation 4/8/24
Beaver Creek Culvert Replacement Project
The bid period for this project has closed. Bid were received and read aloud on Monday February 26th, 2024 at 11:00AM. The Contracting Agency has reviewed all proposals received and the Contract has been awarded to the low bidder. Any questions regarding this project can be directed to Hannah Pygott at hannah.pygott@co.chelan.wa.us
Project Manual and Downloads:
- Project Manual
- Appendix D: Final Contract Drawings
- Bidder Questions and Clarifications
- Planholders list
- Addendum No. 1 Issued 1/30/24
- Addendum No. 2 Issued 2/2124 *Includes Revisions to Sheet 8 of the Final Contract Drawings*
- Bid Tabulation 2/26/24
East Fork Mission Creek Floodplain Restoration Project
The bid period for this project has closed. Bid were received and read aloud on Monday January 22nd, 2024 at 11:00AM. The Contracting Agency has awarded the contract to the low bidder. Any questions regarding this project can be directed to Hannah Pygott at hannah.pygott@co.chelan.wa.us
Project Manual and Downloads:
- Project Manual *Updated 1/10/24 to reflect the changes of Addendum No.1
- Appendix D: Final Contract Drawings *Updated 1/10/24 to reflect the changes of Addendum No.1
- Bidder Questions and Clarifications
- Planholders list
- Addendum No. 1 Issued 1/10/2024
- Addendum No 2 Issued 1/16/2024
- Bid Tabulation 1/22/2024
Upper Wenatchee River Habitat Restoration Project: Helicopter Wood Transport
The bid period for this project has closed. Bids were received and read aloud on Monday January 29th, 2024 at 11:00AM. The Contracting Agency has awarded the contract to the low bidder. Any questions regarding this project can be directed to Hannah Pygott at hannah.pygott@co.chelan.wa.us
Project Manual and Downloads:
- Project Manual Updated 1/30/24 to reflect Addenda Issued during the bid Period
- Appendix D: Final Contract Drawings
- Bidder Questions and Clarifications
- Planholders list
- Addendum No.1 Issued 12/8/2023
- Addendum No. 2 Issued 1/18/2024
- Bid Tabulation 1/29/24
Upper Wenatchee River Habitat Restoration Project
The bid period for this project has closed. Bids were recieved and read aloud on Monday January 29th, 2024 at 11:00AM. The Contracting Agency has awarded the contract to the low bidder. Any questions regarding this project can be directed to Hannah Pygott at hannah.pygott@co.chelan.wa.us
Project Manual and Downloads:
- Project Manual
- Appendix D: Final Contract Drawings
- Bidder Questions and Clarifications
- Planholders list
- Addendum No. 1 Issued 11/8/23
- Addendum No. 2 Issued 1/18/24
- Bid Tabulation 1/29/24
COIC Improvement Project – Delivery Pipelines
The bid period for this project has closed. Bids were recieved and read aloud on Monday January 29th, 2024 at 11:00AM. The Contracting Agency has reviewed all proposals received and the Contract has been awarded to the low bidder. Any questions regarding this project can be directed Mary Jo Sanborn via email at MaryJo.Sanborn@co.chelan.wa.us.
Project Manual and Downloads:
- Project Manual Updated 1/24/24 to Reflect Addenda
- Project Designs Updated 1/24/24 to Reflect Addenda
- Bidder Questions and Clarifications
- Planholders list
- Addendum No. 1 Issued 12/5/2023
- Addendum No. 2 Issued 12/22/2023 *Includes Revisions to the Bid Proposal Form*
- Addendum No. 3 Issued 1/10/2024 *Includes Revisions to the Bid Proposal Form, Bidder Information Sheet and Subcontractors List*
- Addendum No. 4 Issued 1/24/24
- Bid Tabulation 1/29/24
COIC Improvement Project – Intake and Pumping Facilities
The bid period for this project has closed. Bids were recieved and read aloud on Monday January 29th, 2024 at 11:00AM. The Contracting Agency has reviewed all proposals received and the Contract has been awarded to the low bidder. Any questions regarding this project can be directed Mary Jo Sanborn via email at MaryJo.Sanborn@co.chelan.wa.us.
Project Manual and Downloads:
- Project Manual Updated 1/24/24 to Reflect Addenda
- Project Designs Updated 1/24/24 to Reflect Addenda
- Bidder Questions and Clarifications
- Planholders list
- Addendum No. 1 Issued 12/5/2023
- Addendum No. 2 Issued 12/22/2023 *Includes Revisions to the Bid Proposal Form*
- Addendum No. 3 Issued 1/10/2024 *Includes Revisions to the Bid Proposal Form, Bidder Information Sheet and Subcontractors List*
- Addendum No. 4 Issued 1/24/24 *Includes Revisions to the Bid Form*
- Bid Tabulation 1/29/24
Posted: 03/16/2018 01:31 PM
Last Updated: 05/22/2024 02:45 PM